History
Year 2017 | |
---|---|
April, 27th | Foundation of IWS Sp. z o.o. in Zielona Góra |
June, 15th | Installation and commissioning of the equipment of the company Geovista Ltd, in order to perform the well logging. |
June, 27th | The first geophysical measurements in the borehole, made by IWS Sp. z o.o. |
October, 2nd | Obtaining of an authorization to use and transport radioactive sources. |
November, 14th | Purchase of a radioactive source. Introduction of radiometric probes to the performed measurements. |
Year 2018 | |
---|---|
December, 23rd | First optical gyroscope measurements |
April - May | The first geophysical measurements with a set of high-pressure probes, hole depth: 2075.0 m, mud density 1.77 g/cm3. |
October, 25th | Introduction of an acoustic TV and a borehole camera to the performed measurements. |
Year 2019 | |
---|---|
January-April | Introduction of high-pressure gamma-gamma density probe to the performed measurements. |
Year 2020 | |
---|---|
July-December | Service iWS performed a geophysical measurements at the project wind farm BALTIC-II in the Baltic Sea. |